top of page

Construction Monitoring Slab Stage


It never ceases to amaze us how an engineer can sign off allowing a builder to pour concrete when the substrate is uncompacted and bar chairs are compressed into the vapour barrier causing insufficient concrete coverage and incorrect location of slab reinforcing.

Our client was very concerned when the report we provided identified 50 areas on the slab that did not meet the engineers plan / design requirement. There will be no concrete poured until defects are rectified.

Coastal Home & Building Inspections provides high quality construction monitoring to ensure your builder meets the homes engineering design requirements

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page